Critical Path Construction — OSHA Inspection #340501931
MIAMI BEACH, Florida · Structural Steel & Precast Concrete Contractors (NAICS 238120) · 2 workers on site
Inspection completed with no citations issued.
Health inspection · Unprogrammed Other · Comprehensive — entire establishment
What happened in this inspection
On March 6, 2015, OSHA opened Critical Path Construction’s inspection #340501931 at MIAMI BEACH, Florida — an establishment in the structural steel & precast concrete contractors industry. The case was administratively closed on September 3, 2015, 181 days after opening.
OSHA closed this inspection without issuing citations. An inspection-without-citation outcome means OSHA observed the workplace and either found no violations of federal standards or determined any issues did not rise to the level requiring formal citation. It does not by itself prove a workplace is safe — see our methodology for context.
Citations issued in this inspection
No violations were cited in this inspection. View other inspections at Critical Path Construction →
About OSHA inspections
The U.S. Occupational Safety and Health Administration (OSHA) conducts inspections under several triggers: programmed targeting of high-hazard industries, employee complaints, workplace accidents, fatalities, and follow-ups to prior citations.
Each citation specifies a section of 29 CFR, a severity tier, and a proposed penalty. Employers can contest citations through OSHA’s informal conference or before the OSH Review Commission.
An open case has not yet been administratively closed — citations may follow or the case may close without action.
Initial penalty is the proposed amount at citation. Current penalty is the post-conference / settlement figure on file today.
A = Accident, B = Complaint, H = Programmed, F = Follow-up. See the glossary for all codes.
About this inspection
OSHA classified this as Unprogrammed Other — See our glossary for the full list of inspection trigger types.
Cross-check with OSHA directly
This page draws from the OSHA Integrated Management Information System (IMIS) via the DOL Open Data Portal. For the authoritative record, look up activity number 340501931 directly:
Understand OSHA enforcement
Guides and analysis from our editorial team.
Industries With the Most OSHA Violations on Record (2026)
NAICS industries ranked by total OSHA citations and total inspections in the current enforcement window. Construction and specialty trades dominate both leaderboards.
The 15 U.S. Cities With the Most OSHA Inspections (2026)
A city-by-city ranking of U.S. metros with the highest OSHA inspection counts in the current enforcement window — what the city-level data reveals about regional safety enforcement.
OSHA Enforcement in 2026, By the Numbers: 426,000 Employers on Record
An overview of OSHA enforcement activity across 426,760 U.S. employers — 575,985 inspections, 24,000 violations, and $62,581,468 in penalties currently on file.
Seattle vs. Portland: OSHA Enforcement in Two Pacific Northwest Cities Compared
A side-by-side comparison of OSHA enforcement activity in Seattle and Portland — inspection counts, violations, penalties, and what the data reveals about workplace safety in each city.
The 10 U.S. Employers With the Largest OSHA Penalties on Record (2026)
A ranked list of the ten U.S. employers carrying the highest cumulative OSHA penalty assessments in the current enforcement window, with links to their full inspection histories.
The 10 Most-Inspected U.S. Employers in OSHA Records (2026)
Ten U.S. employers with the highest OSHA inspection counts across the current five-year enforcement window, ranked with links to each company's full record.
Top 10 Alabama Employers by OSHA Inspections (2026)
The ten Alabama employers with the most OSHA inspections on record in the current enforcement window — with violation counts, penalty totals, and links to each full inspection record.
Top 10 Alaska Employers by OSHA Inspections (2026)
The ten Alaska employers with the most OSHA inspections on record in the current enforcement window — with violation counts, penalty totals, and links to each full inspection record.
Top 10 Arizona Employers by OSHA Inspections (2026)
The ten Arizona employers with the most OSHA inspections on record in the current enforcement window — with violation counts, penalty totals, and links to each full inspection record.